Bringing Design Control to Complex Open-Space Delivery

For ALDAR's Al Haffar Development Open Space project, Stradigi managed landscape BIM and model production from Schematic Design through Issued for Construction, creating a more controlled pathway for design information as the open-space scope matured.

AH

Al Haffar Development — Open Space

Saudi Arabia

Real Estate & Public Realm

Bringing Design Control to Complex Open-Space Delivery

For ALDAR's Al Haffar Development Open Space project, Stradigi managed landscape BIM and model production from Schematic Design through Issued for Construction, creating a more controlled pathway for design information as the open-space scope matured.

The engagement connected utility interfaces, site grading, interdisciplinary coordination and stakeholder review within one governed design context - strengthening continuity across the decisions that shape construction-ready landscape information.

1

Governed Environment

Real-Time

Performance Visibility

3

Connected Disciplines

1

Central Information Environment

THE CHALLENGE

Design Complexity Intensifies at the Interfaces

Open-space design advances through interconnected decisions. Landscape geometry, utilities, grading, interdisciplinary inputs and stakeholder requirements continue to evolve as design maturity increases.

The management requirement was therefore not simply to progress models through successive stages. It was to preserve coordination across those interfaces so that each design decision remained connected to the information required for the next.

THE STRATEGIC REFRAME

Make BIM the Governance Layer for Design Progression

Stradigi positioned landscape BIM management as the mechanism for governing how design information moved through the lifecycle.

A coordinated information base supported utility-interface resolution, grading decisions, interdisciplinary review and stakeholder readiness as the open-space design advanced toward IFC.

This elevated BIM from a production activity into a design-control discipline, creating greater continuity between evolving design decisions and the information construction would eventually inherit.

HOW STRADIGI RESPONDED

Structuring One Coordinated Path from Design Development to IFC

Stradigi structured the engagement around four connected dimensions of landscape BIM and digital design delivery.

Govern the Design Lifecycle

Landscape BIM management and model production were carried across the documented SD-to-IFC sequence, maintaining a consistent digital basis as the design developed through successive stages.

Resolve Interfaces Earlier

The coordinated BIM environment enabled complex utility clashes to be surfaced and addressed earlier, reducing the risk of unresolved design interfaces progressing downstream.

Coordinate Grading & Interdisciplinary Inputs

Model-based coordination provided a more structured context for site-grading decisions and interdisciplinary alignment as landscape information matured.

Carry Approved Information Toward IFC

The same governed information pathway supported stakeholder review and sign-off readiness while progressing coordinated design information toward construction-ready IFC documentation.

TECHNOLOGY & DELIVERY CONTEXT

A Governed Digital Environment for Open-Space Design

Landscape BIM management and model production created the design-governance environment through which utility interfaces, grading decisions, interdisciplinary inputs and stakeholder review could remain connected from Schematic Design through IFC.

IMPACT

Greater Control Across the Decisions That Shape Design Delivery

The engagement strengthened continuity across the design lifecycle, creating a more disciplined basis for coordinating open-space information as design maturity increased.

Design Continuity Across Stages

Landscape BIM management maintained a consistent information pathway across successive design stages, supporting continuity as the scope advanced from Schematic Design toward IFC.

Earlier Utility & Grading Visibility

Complex utility clashes and grading conditions were brought into the coordinated digital environment earlier, strengthening the basis for design resolution before downstream delivery.

Stronger Review & IFC Readiness

Coordinated information supported stakeholder review, interdisciplinary alignment and progression toward construction-ready documentation.

WHY IT MATTERS

Design Governance Protects What Construction Inherits

Open-space delivery becomes harder to control when utilities, grading, design interfaces and stakeholder requirements progress at different speeds.

A governed BIM pathway keeps those decisions connected as information matures, strengthening the quality and continuity of the design package before it moves into construction.

Al Haffar Open Space demonstrates how Stradigi applies built-environment expertise and digital implementation to create greater control over design progression, coordination and downstream readiness.

RELATED EXPERTISE & SOLUTION

Expertise Applied Across Open-Space Design Delivery

PRIMARY EXPERTISE

Built Environment Digital Transformation

Structuring landscape BIM, design information and interdisciplinary coordination around the governance requirements of a complex real-estate and public-realm environment.

SECONDARY EXPERTISE

Digital Delivery & Implementation

Carrying design-stage requirements into managed model production, coordinated review and construction-ready IFC information.

Strengthen Design Control Before Complexity Reaches Construction

Where utilities, grading, interdisciplinary inputs and stakeholder requirements must progress together, Stradigi structures the BIM governance and digital delivery pathway required to preserve design integrity through IFC.