Megaprojects · Urban Infrastructure
Connecting Construction Intelligence to Linear-City Delivery
Across THE LINE | NEOM's documented infrastructure and piling scope, Stradigi served as BIM consultant, creating and coordinating detailed BIM models while connecting construction sequence, logistics and project reporting within one digital delivery context.
THE LINE | NEOM
Tabouk, Saudi Arabia
Urban Development

Across THE LINE | NEOM's documented infrastructure and piling scope, Stradigi served as BIM consultant, creating and coordinating detailed BIM models while connecting construction sequence, logistics and project reporting within one digital delivery context.
Within a 2.7 linear-kilometre project-reference scope and USD 10 billion project context, 4D BIM was used to manage logistics and optimise construction sequences, while Power BI provided dynamic reporting and real-time visibility into project progress and performance.
1
Governed Environment
Real-Time
Performance Visibility
3
Connected Disciplines
1
Central Information Environment
THE CHALLENGE
Linear Delivery Raises the Standard for Information Coordination
Across infrastructure and piling work, design information, site logistics, construction sequence and progress reporting need to remain coherent as delivery advances along a linear project environment.
The management requirement extends beyond model production. Coordinated BIM information needs to stay useful to the decisions and documentation surrounding logistics, sequence, collaboration and progress visibility through construction.
THE STRATEGIC REFRAME
Connect Model Intelligence to the Decisions Governing Construction
Stradigi's role connected BIM coordination with 4D planning and management reporting so the model environment could remain relevant to execution.
Detailed BIM models established the design-and-construction information base. 4D linked that information to logistics and construction sequence. Power BI translated progress and performance into a dynamic management view, while shop-drawing and as-built outputs extended the information pathway into downstream construction records.
The value was continuity across coordination, sequence, visibility and documentation.
HOW STRADIGI RESPONDED
Orchestrating Information Across the Construction Pathway
Four connected delivery disciplines carried project information from model coordination into execution.
Establish a Coordinated BIM Information Base
Detailed BIM models were created and coordinated across the infrastructure and piling scope, strengthening the integration of design and construction information.
Connect Sequence & Logistics Through 4D
4D BIM was used to manage logistics, optimise construction sequences and improve coordination across delivery interfaces.
Extend Progress into Management Visibility
Power BI enabled dynamic reporting and data visualisation, providing stakeholders with real-time insight into project progress and performance.
Preserve Continuity into Construction Records
Shop-drawing extraction and as-built information carried coordinated project information further into construction documentation and downstream records.
IMPACT
Stronger Coordination, Sequence Visibility & Management Oversight
Sequencing & Logistics Coordination
4D BIM supported logistics management and optimised construction sequencing, with the source recording improved coordination across the delivery context.
Integrated Design & Construction Information
Detailed BIM coordination supported smoother integration between design and construction information across the infrastructure and piling scope.
Real-Time Progress & Performance Visibility
Power BI provided stakeholders with a dynamic, real-time view of project progress and performance.
WHY IT MATTERS
Construction Intelligence Creates Value When Information Travels with Execution
On major infrastructure programmes, BIM becomes more valuable when model information stays connected to the sequence, logistics, reporting and records that govern construction.
THE LINE | NEOM provides proof of Stradigi's strategy-to-execution proposition in a built-environment context: technical information was carried from BIM coordination into 4D planning, management visibility and downstream construction documentation.
The consultancy value is continuity; a connected information pathway that keeps digital delivery relevant to the decisions surrounding execution.
TECHNOLOGY / DELIVERY CAPABILITIES
Capabilities Applied Across the Engagement
BIM Coordination · Detailed BIM Modelling · Infrastructure & Piling BIM · 4D BIM · 4D Simulations · Construction Sequencing · Logistics Management · Power BI · Dynamic Reporting · Data Visualisation · LOD 350-500 BIM Models · Shop Drawings · As-Built Information
RELATED EXPERTISE & DELIVERY CONTEXT
Expertise Applied Across the Construction-Intelligence Pathway
PRIMARY EXPERTISE
Built Environment Digital Transformation
Connecting BIM coordination, model-based information management and construction intelligence across a complex infrastructure and piling context.
SECONDARY EXPERTISE
Digital Delivery & Implementation
Carrying coordinated information into 4D sequencing, logistics, reporting and construction documentation so digital delivery remains connected to execution.
SOLUTION APPLIED
iHub
One Intelligence Environment Across Governance, Collaboration and Performance
Configured for THE LINE | NEOM, iHub connected project information, deliverables, workflows, stakeholder communication, task management and performance intelligence within one integrated project environment.
Explore iHub →FRAMEWORK APPLIED
HAIPn
The Framework Behind Governed Implementation
HAIPn provided the execution architecture behind the engagement; connecting governance requirements, information structures, workflow logic, performance intelligence and implementation within one coherent transformation pathway.
Explore HAIPn →Connect Digital Delivery to the Decisions Governing Construction
Where infrastructure delivery depends on continuity across model information, sequence, logistics and progress visibility, Stradigi structures the digital-delivery pathway around the decisions and information flows that matter through construction.
→Discuss a Similar Challenge →